NEW LARGE HOUSE, KILLINEY, DUBLIN (2000sqft).

January 22, 2016
/ / /
Comments Closed

Brief: Part L compliance – low cost requirement.

BER: A3 achieved using a condensing gas Boiler as the primary heating system, wood burner as secondary. Nutech SEH solar space heating system installed to complete PART L compliance in terms of renewable requirements. The Dwelling was constructed in timber frame resulting in excellent elemental U-values and ultimate Air tightness figure. CFL lighting throughout the property.

Comments are closed.